I have been completing some work in the tub of my D22 STR. I have added a set of drawers made out of ply. They sit inside the two wheel arches. I have covered them with carpet and added aluminium angle to the corners for extra protection. Two 45kg, 700mm ball bearing runners were used to support each drawer and they are secured with recessed t-handle locks.
I have also added two boxes (approx 560mm long x 320mm high x 240mm deep) that sit in front of wheel arches and finish tight behind where the light assembly is fitted.
Into one box I have added a 9ltr ait tank and 150l/min, 150psi compressor. I have also added a pressure gauge, pressure switch, nitto coupler, pressure relief valve and purge outlet. Power is provided to the compressor via 6BS cable and this is routed through a relay activated from a switch inside the cabin.
The other box is being used to set up an auxilliary battery, dc to dc charger, switch panel, 12v cig socket, usb charging port and a number of anderson plug connectors. I will be using a 100 amp deep cycle battery to start with, but hope to upgrade that to a 130 amp AGM in the near future. The DC to DC charger is a Ctek D250S Dual and is connected to one of the front batteries with 6BS Cable. I haven't finished wiring up the anderson plugs as yet, just waiting for some more cable, bus bars and circuit breakers. I will post up some pics once finished.