G-Dubya
Member
Hi all,
just thought I would post up some pics of work I have just finished in the rear tub of my Nav.
I have added a set if drawers that sit between the wheel arches. There is a flat panel across the top to make storing stuff on top of it a bit easier. I have also added two boxes that sit between the wheel arches and the back of the tub. In one box I have added a compressor, 9ltr air tank and associated hardware. In the other box I have added a Ctek D250s Dual dc to dc charger, a switch panel, 12v socket, usb charging ports and 4 Anderson plug outlets. Both boxes are connected to the front batteries using 6BS Cable (Red/Black, Twin Sheath each side).
The boxes and drawers are made out of 12mm ply. All have been sealed during construction. I have added carpet and aluminium angle to protect the corners. Only thing left to do is add some cam locks to the boxes.
All I need to do now is get a canopy on the top to get some room back. That will be the next project. Here are some pics of my efforts.
just thought I would post up some pics of work I have just finished in the rear tub of my Nav.
I have added a set if drawers that sit between the wheel arches. There is a flat panel across the top to make storing stuff on top of it a bit easier. I have also added two boxes that sit between the wheel arches and the back of the tub. In one box I have added a compressor, 9ltr air tank and associated hardware. In the other box I have added a Ctek D250s Dual dc to dc charger, a switch panel, 12v socket, usb charging ports and 4 Anderson plug outlets. Both boxes are connected to the front batteries using 6BS Cable (Red/Black, Twin Sheath each side).
The boxes and drawers are made out of 12mm ply. All have been sealed during construction. I have added carpet and aluminium angle to protect the corners. Only thing left to do is add some cam locks to the boxes.
All I need to do now is get a canopy on the top to get some room back. That will be the next project. Here are some pics of my efforts.