This week I'm aiming to have the rear axle fully assembled and installed with the links, sort the brake lines out, install the shocks, bypasses, bump stops. Fuel tank, lines and cooler plumber up. W2A radiator plumbed up and possibly wired up. Put the spare tire carrier and sides back on so I can weight the car and order the coilovers by the weekend
Enter your email address to join: