Been doing a few small jobs over the weekend. Finished the cutting work to the chassis and have prepped that for painting. I managed to pick up an old third member from a mate for free so I cut that in half to use as my drilling template
I just need to drill and tap the new studs this week and put the third member in and seal it up. Studs are M10 x 1.25 so Im going to use a 10mm bit to start and centre the hole, an 11/32 to drill the hole and then a M10 x 1.25 tap. I need to weld up a few of the old stud holes to seal the centre to the bolting face. Im hoping to get 8/9 out of 11 studs in My build will come to a stand still until I receive my stuff from Calmini. Sorta sucks I'm getting over riding my bike to work when its pissing with rain. Maybe its time to get a daily.......
I just need to drill and tap the new studs this week and put the third member in and seal it up. Studs are M10 x 1.25 so Im going to use a 10mm bit to start and centre the hole, an 11/32 to drill the hole and then a M10 x 1.25 tap. I need to weld up a few of the old stud holes to seal the centre to the bolting face. Im hoping to get 8/9 out of 11 studs in My build will come to a stand still until I receive my stuff from Calmini. Sorta sucks I'm getting over riding my bike to work when its pissing with rain. Maybe its time to get a daily.......