Well its been a few days since I last posted here. Draglink, Tie rod and "railway sleeper" have been off for painting. Just waiting for them to come back on monday. This afternoon im going to tighten all of the bolts up and adjust the coilovers to lower the front a little. last lot of testing had the front sitting 1050 from bottom of rim to top of flares. Ideally I want to get this down to 950 - 1000mm.
Im hoping my rims arrive sometime this week, once they are done it will need a wheel alignment and Im hoping it will be driveable. With any build there will always be a few niggles that need to be sorted out.
I still need to sort out the gearbox cross member and get a driveshaft made up to suit the travel. This can wait till the navs back on the road.
Will post pics in the comming days, stay tuned!